The level of the inside bottom of a pipe at a given point, used to set falls and to check that a new connection will actually drain.
What it means for you
It is the number a builder needs before promising that a new extension can connect into an existing run.
Not sure whether this applies to your property? Ask us. There is no call-out charge and the price is fixed before any work starts.
Call now: 0781 7957 789